Documenting the Current Condition: When Do You Need It, and What Should You Do If You Don’t Have It?

Ilustrační izometrický nákres půdorysu kancelářských prostor znázorňující dokumentaci skutečného stavu objektu

The final result never matches the original design down to the last centimeter—and after a few years of operation, minor modifications, and equipment replacements, no one can remember exactly where each utility line actually runs or where each partition is located today. Documentation of the actual condition exists precisely for this moment: it’s not just a formality to be filed away, but a foundation without which it’s impossible to safely plan further work on the building.

According to Section 245 of Act No. 283/2021 Coll. (the New Building Act), which applies to this section starting in 2024, the owner of a building is required to maintain, for the entire duration of its use, verified documentation that corresponds to its actual construction. If this documentation is missing or does not correspond to reality, and the building did not require a permit, it is replaced by a so-called building passport—a survey and description of the building in its current form. The building authority may request that the owner submit the documentation, and if there is no response, penalties may be imposed.

In practice, this requirement is most evident in situations where the documentation is actually needed for a specific purpose—such as a renovation, sale, final inspection of a modification, or when an inspection technician, designer, or fire department wants to see how the building is actually wired. We’ve written about how to maintain electrical installation documentation and when to update it in in a separate article; this text addresses the broader topic of documentation for the entire construction project and what to do when it is completely missing. It also follows up on the article about, What to Find Out About the Technical Condition of a Building Before Renovation – Assessing the current situation is often the first step in this process.

As-built documentation, design documentation, and building records—they are not the same thing

Project Documentation It is the blueprint used for construction or renovation—it depicts the design as it was intended, not necessarily as it was actually implemented. Deviations occur both during construction and over the years of operation: different routing of utility lines, an opening cut later, a partition moved, or a distribution panel replaced and relocated. Documentation of the Current Condition It captures the building exactly as it actually looks and functions today—floor plans with dimensions, cross-sections, elevations, and a technical report that reflect reality, not a design. Building Passport It is, then, a specific document that replaces the as-built documentation in cases where the structure did not require a permit and no “official” documentation was ever created for it.

The difference is not merely a formal one. A designer preparing an office renovation based on twenty-year-old design documentation may propose demolishing a partition that no longer exists, or, conversely, fail to account for one that was added later. An inspection technician who does not have an up-to-date diagram of the distribution panel must document the condition himself on the first attempt—which prolongs the inspection and increases the risk that he will overlook something.

When You Can’t Do Without It in Practice

Documenting the actual condition of a property becomes essential whenever work is to be done on the property or a decision is to be made about it based on accurate data rather than estimates. The most common situations:

SituationWhy Documentation Is Necessary
Renovation or Construction WorkThe designer needs to know the actual dimensions, the routes of the utility lines, and the structure—not the specifications from the original design.
Sale or Rental of Real EstateThe buyer or tenant verifies the floor plan and square footage; the documentation also serves as the basis for the building’s energy performance certificate
Change in the Use of SpaceThe building authority assesses a building’s new use based on its actual appearance and technical specifications
Notice from the Building AuthorityUnder Section 245(3), the agency may request the documentation directly; failure to respond may result in penalties
Supplementary Building PermitThe agency evaluates legalization based on what actually exists on the property
Inspections and Routine Technical MaintenanceA technician needs an up-to-date wiring and equipment diagram; otherwise, he has to figure it out from scratch every time he works on the system.

There are no active inspection campaigns by the authorities—the risk materializes almost exclusively when an authority requests documentation regarding a specific matter and the owner fails to respond, or when missing documentation complicates the actual execution of work on the property.

What happens if the documentation is missing or out of date?

If the building authority formally requests the documentation and the owner fails to provide it, a fine may be imposed—the upper limit of the fine has increased to as much as 400,000 CZK under the new Building Act. In practice, the fines actually imposed by individual authorities are significantly lower and depend on the specific situation; while these amounts are not ruinous, the risk is very real and, more importantly, unnecessarily prolongs and complicates the entire process. A bigger practical problem is that without up-to-date documentation, the preparation for the renovation itself is halted or slowed down, the final inspection of the modification, or the sale—the designer, inspection technician, or fire department must assess the condition themselves the first time around, often directly on site, which means more time and additional costs.

Note: As modifications to the building progress, the as-built documentation “wears out” just like the building itself. Every renovation, addition, or replacement of equipment that has not been retroactively recorded in the documentation is another step toward a situation where, during the next intervention, it will be necessary to survey the current condition practically from scratch.

What to Do If You Don’t Have the Documentation – Surveying the Actual Condition

If the documentation is missing or clearly out of date, the solution is to have a survey of the current condition prepared—either as comprehensive documentation or as a building profile. In practice, this usually works as follows:

1. On-site survey of the building—layout, dimensions, structure, and utility routes. For larger or more complex facilities (warehouses, manufacturing plants, and large office buildings), laser scanning is increasingly used today to make the surveying process more accurate and faster.

2. Preparation of the drawing section—floor plans, sections, elevations, typically at a scale of 1:50 or 1:100 depending on the size of the building—and technical reports containing basic data (built-up area, enclosed volume, description of structures and equipment).

3. Check with the specific building authority to determine the scope and format of documentation required for the given purpose and type of structure—requirements vary by authority and type of structure, and for certain scopes, authorization from a designer or engineer is required. This is a point where it pays to check the specific requirements first before beginning the surveying process.

The processing time depends on the size and complexity of the property—for smaller business premises or office spaces, it ranges from a few days to a few weeks; for larger commercial properties or historic buildings, it can take significantly longer. The same applies to the price: for a smaller property, it typically ranges in the lower tens of thousands of crowns, while for large or complex structures, it is significantly higher—these are approximate ranges; the specific price is always determined by the scope and condition of the particular property.

Checklist: Is Your As-Built Documentation in Order?

☐ Is there any documentation at all?
Do you know where it is stored, and does it correspond to the type of document (project documentation, as-built documentation, or building record)?

☐ Reflects reality
Have there been any renovations, additions, or major modifications to the utility systems since the building was constructed that are not recorded in the building records?

☐ It’s complete
Does it include drawings (floor plans, cross-sections, elevations) as well as a technical report, rather than just a fragment or an old version of one section?

☐ It is available to those who need it
Does the designer, inspection technician, or building maintenance staff have access to it, or is there only a single paper copy in the archives?

☐ Do you know who to contact if something is missing?
Do you know anyone who can arrange for a survey of the current condition or a property report before you urgently need one?

FAQ

Does every building have to have documentation of its current condition?
This requirement applies to structures that required a permit—in such cases, the owner must have certified documentation that corresponds to the actual construction. For structures that did not require a permit, the building passport serves as a substitute for the missing documentation.

Is the original project documentation sufficient, provided that construction was actually carried out according to it?
Only if the actual implementation did not differ from the project in any way and no modifications have been made since then. In practice, after years of operation, there are almost always differences, at least in the details.

Who can prepare a survey of the actual condition?
Depending on the scope and purpose, this could be a designer, a licensed engineer or architect, or a surveyor for purely geometric surveying. It is always a good idea to verify the specific licensing requirements with the relevant building authority before commissioning the work.

What happens if I don’t submit the documentation when requested by the agency?
Penalties may be imposed, and the maximum fine has been raised to 400,000 CZK. In practice, the fines actually imposed tend to be significantly lower and depend on the specific circumstances, but this still results in delays and complications with further proceedings.

How long does a site survey take?
For smaller facilities, it usually takes days to weeks; for larger facilities, it takes longer—the specific timeline will depend on the scope of the work and the availability of existing documentation.

Documentation linked to technical records—not just paper in an archive

The most common reason why as-built documentation ceases to reflect reality after a few years is simple—it remains as a PDF or a paper file in the archive, and no one updates it when the building undergoes further modifications. INTECHI therefore does not maintain the documentation as an isolated file, but as part of client portals – a custom web application in which documentation is linked to specific devices and their inspections:

☐ Pairing with Device Cards
Drawings and technical documents are assigned to a specific piece of equipment or part of a structure, not just to the building as a whole—so during an inspection or renovation, both the technician and the designer can view the relevant portion of the documentation directly.

☐ Importing CAD Files and Drawings
Existing drawings and diagrams can be uploaded and linked to the equipment inventory, so they don’t have to be searched for again with every new order.

☐ Document Processing and Archiving
New documentation created during an as-built survey or inspection is stored digitally and is searchable—not just as a single paper copy available to only one person in the company.

☐ Tracking Deadlines
The system will notify you when an audit or inspection is approaching that will require up-to-date documentation, so you don’t find out at the last minute that it’s missing.

☐ Automation of Follow-Up Steps
If a review or inspection reveals a discrepancy between the documentation and the actual conditions, this serves as the basis for the next step—correction, updating the drawing, or ordering a survey—without any additional paperwork.

How INTECHI Handles It

Whether the documentation is completely missing or simply doesn’t match what remains of the facility after years of operation and modifications, INTECHI will help determine what needs to be addressed and link the results to the records of inspections and technical equipment in the client portal—not as a one-time delivery of paperwork, but as part of the building’s long-term technical management.