Technical Condition of the Building Before Renovation: What Should You Find Out Before Commissioning the Project?
A renovation plan can be drawn up in a few weeks. What’s worse is when, only after the partitions are torn down, it turns out that the utility lines in the floor run through completely different paths than the old documentation indicated—and suddenly, both the deadline and the budget are at risk. This is precisely what determining the actual technical condition of the building before the project is commissioned is intended to prevent. It is a step that is often skipped in the rush to get started quickly, and then has to be made up for at great expense once construction is underway.
The project documentation available to the operator generally describes the condition of the building at the time of its construction or the last major renovation—not its current, actual condition. In the meantime, minor modifications not documented in the records may have occurred, along with “quick-and-dirty” repairs, changes in the ownership of rental units, and the simple aging of structures and systems. The new Decree No. 131/2024 Coll., on Building Documentation (which builds upon the Building Act No. 283/2021 Coll.), in fact, accounts for this gap between the documented and actual conditions and treats as-built documentation as a separate category.
Unlike inspections of designated technical equipment, which we described in detail in the article on the difference between an inspection, a check, and a technical examination, a structural and technical survey does not focus on a single specific piece of equipment, but rather on the building as a whole—its structures, utility systems, and their interconnections. It is also closely related to how up-to-date the electrical installation design documentation is, which we discussed in a separate article on project documentation for electrical installations.
Structural Engineering Survey vs. Project Documentation—What’s the Difference?
Project documentation describes what a building is supposed to look like—based on the design or, if applicable, the most recent approved revision. A structural survey, on the other hand, determines what the building actually looks like and what condition it is in—regardless of what the paperwork says. In the case of an older commercial building, an office that has had several tenants, or a business premises that has undergone a series of minor modifications, these two perspectives commonly diverge. The greater the discrepancy, the higher the risk that a renovation project based solely on outdated documentation will only come face-to-face with reality once the work actually begins.
What exactly is examined when determining the actual situation?
The scope varies depending on the type of property and the planned extent of the renovation, but for commercial spaces, the following areas are typically assessed:
| Scope of the Survey | What Is Being Investigated |
| Support and Partition Structures | Actual location of walls, openings, and load-bearing elements; visible cracks, deformations, and condition of surfaces |
| Electrical Installations and High-Voltage Systems | Tracing of wiring, condition of distribution panels, compliance with current standards, and any temporary wiring |
| Plumbing and Gas Equipment | Water, sewer, and gas lines; age and condition of the distribution systems; accessibility of shut-off valves and inspection points |
| Moisture and Structural Stability | Moisture map of structures, potential salt accumulation in masonry, preliminary structural assessment of modifications to load-bearing elements |
| Hazardous Materials | The presence of asbestos, old paint, or insulation in buildings of a corresponding age |
| Fire Safety Solutions | Compliance of the Current Condition with the Building Fire Safety Regulations: Escape Routes, Fire Barriers, and Fire Seals |
| Rule of thumb: The older the building or the less up-to-date its documentation is, the more worthwhile it is to invest time in determining its actual condition before the project is commissioned—not during construction, when correcting a design error is significantly more expensive and delays the entire project. |
When is market research truly essential?
Not every minor modification to a facility requires a separate, full-scale structural survey—for simple painting or floor replacement that does not involve structural changes, a routine inspection is usually sufficient. It makes sense especially when load-bearing structures will be altered, the layout of interior walls will be changed, utilities will be relocated, or when up-to-date design documentation is missing and the building has undergone multiple unrecorded modifications. It is also appropriate for properties where the type of use is changing—for example, from offices to a showroom or from a retail unit to a facility with higher demands on technical infrastructure.
Who conducts the fact-finding investigation?
Depending on the scope of the project, this involves a combination of several areas of expertise—a civil engineer or structural engineer for the structural portion, an inspection technician to assess the electrical wiring and other designated technical equipment, and, if necessary, a specialist in moisture or hazardous materials. Precisely because this involves a compilation of individual findings from various fields, it is practical to have them managed by a single team that can integrate the results into a comprehensive report for the designer—rather than several separate reports that the operator must then piece together on their own.
What are the risks of skipping the fact-finding process?
The most common consequence is simple—additional costs and delays. The project accounts for something that isn’t actually present in the building (or vice versa), and adjustments must be made on the fly, in the middle of construction, when they are most expensive and most disruptive to the schedule. Furthermore, with older buildings, there is a risk that demolition or structural work will uncover hazardous materials or hidden utilities, the damage to which could pose a safety risk or cause operational disruptions in adjacent parts of the building.
Checklist: What to Find Out Before Assigning a Project
☐ Documentation Up-to-Date Status
Does the available project documentation reflect the actual condition of the building, or has the building undergone unrecorded modifications?
☐ Scope of the Planned Intervention
Will there be any changes to the load-bearing structures, floor plans, or systems, or will the work be limited to surface finishes?
☐ Age of the building and its systems
Do the electrical wiring, plumbing, and gas lines meet current standards, or are they significantly older?
☐ Risks Posed by Hazardous Materials
Is the building old enough that there is a realistic possibility it contains asbestos or other older building materials?
☐ Fire Safety Solutions
Does the current status of the construction’s building permit correspond to the planned layout changes, and will it remain valid after those changes are made?
☐ Who will process the outputs and who will forward them to the designer?
Is it clear who will conduct the individual assessments and in what format they will be made available to the designer?
FAQ
Is determining the actual situation required by law?
This requirement depends on the scope and nature of the construction work—for both projects subject to notification and those requiring a permit, the building authority typically requires that the documentation reflect the actual condition of the structure. Even where the authority does not explicitly require it, it is always advisable to do so for practical reasons whenever structural elements or systems are altered.
How long does it take to determine the actual situation?
For a smaller business or office, it usually takes a matter of days; for a larger or more complex building, it can take several weeks—depending on the scope of the project, the accessibility of the structures, and the number of specialized fields that need to be involved.
Can the status check be performed without interrupting operations?
In most cases, yes—it involves a visual inspection, measurements, and spot checks, which can be scheduled to minimize disruption to the facility’s normal operations.
Who will benefit from the status report?
Primarily the designer, who uses it as a basis for proposing solutions that reflect the actual conditions of the building, but also the operator—as a basis for deciding on the scope and budget of the planned renovation.
Is it worth checking the condition even for minor modifications?
For purely cosmetic renovations that do not involve any work on structural elements or systems, this is usually not done to the full extent—but even in such cases, it is worth at least conducting a general assessment of the condition of the areas that will be affected.
An assessment of the actual status linked to the technical records, not just a one-time report
A report on the technical condition of a building is only useful if it is acted upon—not if it ends up as a PDF attachment to the project documentation. That is why, at INTECHI, it is linked to the same client portal, in which we also conduct inspections and maintain technical records for the building:
Pairing with Device Cards – The assessed condition of the installations and structures will be linked to existing records of the facilities in the building, not just to a general description of the building.
Importing CAD Files and Drawings – As-built surveys and existing drawings will be uploaded and linked in one place, accessible to both the designer and the operator whenever needed.
Document Processing and Archiving – Status reports, photo documentation, and interim reports remain digitally stored and searchable, rather than scattered among emails and paper files.
Automation of Follow-Up Steps – Any problem identified (e.g., an inappropriate distribution route) is immediately incorporated into the specifications for the designer or implementation team, without any unnecessary delays between steps.
Tracking Deadlines – If the status check reveals that a review is due soon or that further assessment is needed, the client portal will automatically notify you in advance.
How INTECHI Handles It
Whether it’s office space, a retail unit, or a facility being prepared for a major renovation, INTECHI will assess the actual technical condition of the building as part of the project preparation—from structural elements to building systems to fire safety solutions—and will make the results available in the client portal, where they remain accessible even after construction is complete.